Trimble TILOS develops methods and tools to make the planning of linear and repetitive work more efficient.

The TILOS solutions improves the integration of location constraints in scheduling via the critical path method (CPM). Integration with other project management systems plays a major part in the development, allowing users to retain their established company standards while using the premium solution for linear planning.

  • No other project management system gives you greater power to plan linear projects.
  • Construction site geometry, schedules, resources and costs in a single plan help to foresee and avoid expensive pitfalls in order to achieve your desired targets.

Linear Project Management

  • Robust scheduling software for linear infrastructure projects that combines time and distance into one graphical view. Successful planning of large and spread out civil construction projects is an optimization challenge that the TILOS software is purpose-built for; industry specific analysis helps establish and visualize a proper plan of execution with emphasis on movement and flow around the jobsite.

 

Linear Scheduling

  • Planning linear construction projects by using time location diagrams and the comprehensive linear scheduling features is highly effective. Deliver optimized and reliable schedules. Communicate your projects effectively. 
  • Visualize the whole project on a single summary and assist the whole team and the key stakeholders to easily understand the plan.

 

Open Data Exchange

 

  • Exchange data with other project management systems such as Primavera P6, Microsoft Project and Asta Powerproject. Import site data such as mass haul, elevation or site map. Insert quantities, equipment and costs from spreadsheet.

Scaled Location Charts

  • Use powerful drawing tools to place symbols and objects based on distance coordinates
  • Use a symbol library to easily prepare scheme drawing diagrams
  • Import existing route-diagrams directly into the chart and scale them to size automatically
  • One chart has everything you need
  • Split the chart into multiple sections so you can display more information
  • Clearly show the different stages of construction
  • Include detailed drawings with site plans
  • Show resource usage (plant, people and materials)

 

Resource and Cost Planning

  • Calculate task duration from the working speed (performance) and the distance or from work quantity and performance
  • Calculate resource utilization using quantities or time with flexible calculation models
  • Create quantity and cost charts to show time-specific and absolute resource requirements over the duration of a project

 

Customizable Views

  • Define project, scale, site plan and chart areas, and use them to create customizable project views showing common data in different ways
  • Integrate Gantt diagrams, time and location diagrams, cost and resource diagrams, and spatial information to one comprehensive chart

 

Mass Haul Data and Diagrams

  • Create different types of material such as cut, fill and disposal
  • Enter or import different cut/fill locations and quantities
  • Create tasks based on quantity and productivity for each cut/fill movement to quickly build a schedule
  • Display consumption graphs based on location or time

 

Progress Tracking

  • Progress tasks by location as well as by time and completion percentage attained
  • Baseline and compare the original plan to current project progress to detect variances immediately and compensate for them in real-time
  • Calculate earned value measures for tasks and sub-projects

 

Highway Construction: TILOS provides a comprehensive planning tool for road projects of all sizes and complexity.

 

Pipeline Construction: Pipeline construction presents construction challenges such as maintaining crew separation, equipment move-arounds, permitting, land acquisition and crossings.

 

Railway Construction: TILOS comes with a set of special railway building functions to support the daily work of the planners.

 

Engineering: In bridge projects the pile and foundation work is normally created as rectangles showing at which pile the work gets executed. This work is repeated in time for each pile. TILOS supports bulk creation of tasks – each on the defined position.

 

Tunnel Construction: TILOS supports a number of special functions for tunnel builders to make planning easier while delivering even more data.

 

Water Engineering: Harbor facilities, waterways, canals, wave-breakers, dikes, barrages, widespread sheet pile walls – many buildings along and across waters and the sea are linear projects.

 

https://youtu.be/_12qR3P_9KQ

TILOS Introduction

 

https://youtu.be/6ImGeGWK31U

Railway projects scheduling & controlling in TILOS

TILOS – time and location planning software for highways, railways, pipelines, tunnels, water engineering, transmission line construction and other linear civil engineering projects.

 

https://youtu.be/Aar-y7qsKZ8

Road and Highway Projects Scheduling & Controlling in TILOS

TILOS – time and location planning software for highways, railways, pipelines, tunnels, water engineering, transmission line construction and other linear civil engineering projects.

Download additional information from the links below.

  • Tilos Brochure – Download 
  • Tilos 10.2 Release Notes – Download 
  • Tilos Mass Haulage Diagrams for Embankments Works – Download  

Upcoming Events

FREE Trial

Our team of experts can save you time by creating project templates and can assist with the import and export of data between Tilos and other software applications.

Product Updates

Top 5 Reasons for TILOS:

 

1. Effective Communication

2. Professional Presentations

3. An Integrated Project Planning Solution

4. Open Data Exchange

5. Cost Effective